Brierley Associates helped Southland Contracting redesign 1.8 miles of 72-inch diameter water main to allow microtunneling trenchless construction, avoiding costly and disruptive cut-and-cover installation. A detailed discussion of the geotechnical program was included in the TX & OK Trenchless Report 2020.
Click here to learn more about the Eagle Ford Shale.